UFRs and df/dt are envisaged to take care of sudden contingencies arising out of outage of generation stations or separation of inter regional lines. UFRs setting are for steady state operation of the Grid at considerably low frequency and df/dt settings are for dynamic change change when frequency falls suddenly with jerks.

The existing settings of UFRs are 49.2 Hz , 49.0 Hz 48.8 Hz and 48.6 Hz with the following State wise load relief :

12       Load relief in MW
STATES Peak MW Met 2012-13 49.2 Hz 49.0. Hz 48.8 Hz 48.6 Hz TOTAL
Punjab 8751 400 402 406 408
Haryana 6725 308 309 312 314
Rajasthan 8515 390 392 395 397
Delhi 5642 258 259 262 263
UP 12048 551 554 559 561
Uttarakhand 1674 77 77 78 78
HP 1672 77 77 78 78
J & K 1817 83 84 84 85
Chandigarh 340 16 16 16 16
TOTAL 47184 2160 2170 2190 2200

उत्तरी क्षेत्र में निचली आवृत्ति पर बिजली कटौती की योजना के लिए यहाँ क्लिक करें
Click here for Under frequency load shedding scheme in Northern Region

State wise load relief of df/dt relays is as given below.


34       Load relief in MW
STATES Stage-I
49.9Hz& 0.1Hz/sec
Stage-II
49.9Hz&0.2Hz/sec
Stage-III
49.9Hz&0.3Hz/sec
Total
Punjab 430 490 490 1410
Haryana 280 310 310 900
Rajasthan 330 370 370 1070
Delhi 250 280 280 810
UP 500 280 280 1060
Uttarakhand 70 70 70 210
HP 50 70 70 190
J & K 90 90 90 270
Chandigarh 0 50 50 100
TOTAL 2000 2010 2010 6020
Northern Regional Power Committee